Every pool service company reaches the job it cannot do. A heater board that needs a licensed gas fitter. A cracked bond beam. An automation panel nobody on the truck has seen before. A leak that has moved past dye testing and into pressure testing and excavation. The work is real, the customer is yours, and the question is whether you turn it away, learn it, or hand it to somebody who already knows how.

Most owners answer that question one job at a time, under pressure, on the phone. The result is a subcontracting arrangement that was never designed: no written agreement, no insurance certificate on file, a markup picked in the moment, and no clear answer to who the customer calls when the part fails in August. None of that matters until something goes wrong, and then all of it matters at once. This is the version of the decision made in advance.

When to sub it out, and when to do it yourself

The instinct is to decide on capability: can my technician do this? That is the wrong first question, because the answer is usually "probably, eventually, badly." The better question is economic. A technician doing a repair is a technician not doing the route, and the route is the revenue you have already sold. If a three-hour repair costs you a half-day of stops you then have to make up on a Saturday, the repair has to earn more than that half-day plus the Saturday to be worth doing in-house.

The second question is about failure. Some jobs fail quietly - a seal that weeps, a fitting that has to be redone next week - and some fail expensively, in ways that involve gas, electricity, structural concrete or a flooded yard. The jobs in that second group are the ones where a specialist's insurance, licence and experience are worth more than the margin you give up, and they are the ones where doing it yourself to save a few hundred dollars is the most expensive decision available.

Which repairs tend to stay in-house, and which tend to go out

Pump, motor and filter replacement

Usual home
In-house
Why
Frequent, predictable, and the parts and procedure repeat. This is the work that justifies owning the skill at all

Valves, plumbing and union repairs

Usual home
In-house
Why
Same reason. Short jobs that fit between stops and rarely escalate

Heater diagnostics and gas work

Usual home
Usually out
Why
Licensing is the deciding factor, not difficulty. In most places gas work is a licensed trade and the liability of getting it wrong is not insurable by improvisation

Electrical beyond a simple swap

Usual home
Usually out
Why
Panels, bonding and new circuits sit on the other side of a licence in most jurisdictions. A pool is the worst possible place to be wrong about bonding

Automation and control systems

Usual home
It depends
Why
Worth learning if you see the same system repeatedly in your market, worth sending out if every job is a different platform you meet once

Leak detection and repair

Usual home
Often out, at least at first
Why
Dye testing is within reach of most route technicians. Pressure testing, locating and excavation are a different trade with its own equipment

Surfaces, tile and structural concrete

Usual home
Out
Why
Different trade entirely, different crews, different timelines. Almost nobody running a service route does this work themselves

Overflow route coverage and holiday cover

Usual home
Out, but it is a different arrangement
Why
Covering stops is not a repair subcontract. It is closer to employment and it attracts the classification scrutiny described below

This is a general pattern, not a rule, and it moves with your crew. A company with a licensed electrician on staff keeps work that another company has to send out; a company with one technician and a full route sends out more than both. Licensing requirements for gas, electrical and structural work vary by state and locality - check yours before deciding anything in this table applies to you.

The job you keep sending out is telling you something

Track which jobs you subcontract over a season. If the same type of work goes out six or eight times, you are paying a specialist repeatedly for something your market reliably demands - and that is the case for training someone, buying the tool, or hiring for the skill. The pattern is only visible if you record it, which is the argument for logging the subcontracted job in the same place as everything else rather than in a text thread.

What to charge, and why a thin markup is the dangerous one

The common mistake is to treat the subcontractor's invoice as a cost to be passed through with a modest uplift. Ten or fifteen per cent feels fair, because you did not do the work. But you are not being paid for the work. You are being paid for finding the subcontractor, vetting their insurance, scheduling them against a customer who wanted it Tuesday, explaining the quote, carrying the invoice until the customer pays, and standing behind the result for as long as your warranty runs. That is a real job with real cost, and it does not get cheaper because the wrench was in somebody else's hand.

The carry
Everything you are responsible for on a subcontracted job that is not the work itself: the scheduling, the customer communication, the invoice and the collection risk, and the warranty for its full term. The markup is the price of the carry. If the markup does not cover a return visit when the job fails, you have priced the work and not the risk.

Two practical consequences follow. The first is that your markup should be higher on work with a long warranty tail and lower on work that either succeeds or fails the same week - a heater installation and a valve swap do not deserve the same uplift. The second is that your quote to the customer should be a single price for the job, not an itemised pass-through of what the subcontractor charged you. Showing the customer the subcontractor's number invites them to call the subcontractor directly next time, and it frames your markup as a fee rather than as the price of the thing they are buying. How you build and present that number is the ordinary business of quoting in pool service software, and a subcontracted job should pass through it looking like every other quote you send.

Whose name is on the work

The customer did not hire a subcontractor. They hired you, they will pay you, and when the motor you had replaced starts screaming in July they will call your number. This is worth stating plainly because the agreements people sign often imply otherwise, and because the gap between the legal position and the customer's position is where reputations are lost. Your subcontractor may warrant their labour to you for thirty days. Your customer believes they bought a repair from a company they trust, and thirty days is not a period they have heard of.

A technician kneeling at a backyard pool equipment pad with the pump opened and a replacement motor and tool roll on a drop cloth, while a second technician nets the same pool in the background with a leaf rake on a telescopic pole
Two people, one company, as far as the customer is concerned. Whoever turns the wrench, the repair was bought from you.

So the warranty you give the customer has to be a term you can actually honour, which means knowing what your subcontractor gives you before you quote it, not after the failure. Where the two do not line up, the difference is yours to absorb, and it should be priced into the markup rather than discovered later. The same logic governs damage: if a subcontractor cracks a tile or floods an equipment pad on your customer's property, the customer's complaint arrives at your office. Our walkthrough of what to do when a technician damages a customer's pool applies almost unchanged, with one addition: you will be managing the customer and the subcontractor's insurer at the same time, and only one of them is in a hurry.

The handoff, and where it usually breaks
You scope and quoteWritten work order outCertificate checkedWork done, you inspectYou invoice the customerWarranty sits with you

Insurance, and the certificate you actually have to collect

Ask any insurance broker who writes pool contractors what the common failure is and the answer is not exotic: the company collected a certificate once, filed it, and never looked at it again. A certificate of insurance is a snapshot of coverage on the day it was issued. A policy cancelled in May does not update the paper in your binder, and an uninsured subcontractor working on your customer's property is, in practical terms, your exposure. The fix is administrative rather than clever - collect it before the first job, record the expiry date, and refuse work from anyone whose certificate has lapsed.

A pool service owner at a workshop bench turning pages in a ring binder of insurance certificates with coloured tab dividers, a pool pump and sand filter on the bench beside him and the roller door open behind
The certificate is only worth the date on it. Record the expiry the day you file it.

Before a subcontractor touches a customer's pool

0 / 7

The classification trap, which is the expensive one

Everything above assumes a genuine subcontractor: a separate business, with its own customers, its own insurance, its own truck and tools, deciding how the work gets done. The arrangement that gets pool companies into trouble is the one that drifts. A "subcontractor" who works only for you, five days a week, in a shirt with your logo, driving your truck, following your schedule and your methods is being treated as an employee by every test that matters, whatever the agreement is titled.

This is not a technicality. Misclassification brings back taxes, penalties, unpaid overtime and workers' compensation exposure, and the rules are stricter in some states than others. The distinction also matters more for route coverage than for repairs: a specialist who installs a heater for you twice a month and for eleven other companies the rest of the time is plainly running their own business, while someone covering your route every Thursday in your truck plainly is not. We set out the tests and the costs in 1099 versus W-2 for pool technicians, and the honest summary is that this is a question for an employment attorney in your state rather than for an article or a template.

Templates cover the arrangement they were written for

Subcontractor agreement templates circulate in this market and they are a reasonable starting point, but check what each one is actually for. PoolDial publishes one behind an email form, and its own description, read on 19 November 2026, frames it around servicing overflow routes, covering vacations and expanding into new areas - route coverage, not repair work. Its listed sections cover independence, routes and service areas, per-stop rates, insurance minimums, non-solicitation and termination. It does not mention warranty on the work, certificate renewal or lien waivers, and the page itself recommends having an employment attorney review it for your state's rules. A template built for route coverage will not answer the questions a repair subcontract raises.

What belongs in a repair subcontract specifically

Assume you have the standard clauses - independence, insurance minimums, non-solicitation, termination, confidentiality. The clauses that are usually missing are the ones specific to repair work, where a physical thing was installed in somebody's yard and will either keep working or will not.

  1. 1

    A warranty term, in writing, with a remedy

    How long their labour is warranted, what happens on a callback, and who pays the return visit. "We stand behind our work" is not a term. If their warranty is shorter than the one you give your customer, you now know the size of the gap you are carrying, which is the point of asking.

  2. 2

    Who supplies the parts, and whose warranty applies

    Parts you supply carry the manufacturer's warranty and your markup. Parts they supply carry theirs, and you may not know what it is. Decide which way this runs as a standing rule rather than per job, because mixed practice is how a failed part ends up warranted by nobody.

  3. 3

    A scope-change rule with a dollar threshold

    Repairs reveal problems. Set the amount below which the subcontractor may proceed and above which they must stop and call you, and make clear that work done past the threshold without approval is theirs to absorb. Without this clause you will one day receive an invoice for a job nobody authorised.

  4. 4

    Customer contact rules

    Whether they may speak to your customer at all, and what they may say about price, scope or scheduling. A subcontractor quoting additional work directly to your customer is the fastest route to losing the account, and most do it without any bad intent.

  5. 5

    Photographs and documentation at completion

    Before, after, and the equipment label with the model and serial number. This costs the subcontractor two minutes and settles warranty claims, insurance questions and "it was already like that" arguments for years afterwards.

Where this leaves a route with a full book and no heater licence

Subcontracting is not a failure to grow and it is not a permanent arrangement either. For most service companies it is how a capability gets tested before it gets bought: you send out heater work for two seasons, you watch how much of it there is and what it earns, and at some point the volume justifies the licence, the training or the hire. Companies that never subcontract turn away revenue they could have kept. Companies that subcontract without an agreement, a certificate and a markup that covers the carry keep the revenue and give away the margin and the risk at the same time.

The administrative half of this is less interesting than the judgement but it is where the money leaks. If the subcontracted job lives in a text thread, nobody can tell you how many went out last season, what they earned, or which one the customer is calling about. Logging it as a job like any other - with the quote, the work order, the photographs and the invoice attached - is what turns a pile of favours into a line you can actually manage. Deciding what you can handle on the visit and what needs a specialist is the same judgement we worked through for pool leak repair, and the insurance side of it sits alongside the coverage questions in pool cleaning business insurance.

If the record-keeping is the part that falls over - quotes in one place, subcontractor invoices in another, warranty terms in nobody's head - that is the part software should be holding. You can start a 30-day trial of Pool Runs and run a season's worth of repair work through it before you decide anything.

Ready to try Pool Runs?